A link to download Entergy’s Post Shut Down Activities Report (PSDAR) is at the bottom of this page. The comment period to the NRC on the PSDAR ended March 24, 2015. A link to the Comment page is: http://www.regulations.gov/index.jsp#!docketDetail;D=NRC-2015-0004
Update: the NRC is slowing posting comments. Now 12 of the 40 public comments submitted to the NRC are available on its website.* The following are Public Comments, available as PDF downloads. Those marked * have yet to be posted on the NRC’s site (as of 04.07.15).
VT to NRC on PSDAR 03.06.15_State of VT Comments
Legislators PSDAR Comments February 27
* NRC – Town of Brattleboro comments PSDAR
* Windham Regional Commission Comments
* LSS Comments on PSDAR Entergy VT Yankee
* Fairewinds-Energy-Education VY Decomm
NRC PUBLIC MEETING The NRC took public comment on Entergy’s PSDAR on February 19 at the Quality Inn, Brattleboro, VT). LINK TO POST-MEETING INFORMATION
Entergy’s PSDAR: 12.19.15 [218 pages] BVY-14-078-PSDAR-and-Decommissioning-Cost-Estimate1 Appendices and other state, federal and NDCAP documents can be found on VY Decommissioning website. Comments on DRAFT (prior to 12.19.15): Non-agency-Comments-on-SAS-Draft-PSDAR(1) (including Town of Brattleboro, Windham County Regional Commission, Tom Buchanan).
Background: VY_Settlement_Agreement_12.23.13
Note: Agencies review all submissions, however some agencies may choose to redact, or withhold, certain submissions (or portions thereof) such as those containing private or proprietary information, inappropriate language, or duplicate/near duplicate examples of a mass-mail campaign. This can result in discrepancies between this count and those displayed when conducting searches on the Public Submission document type. For specific information about an agency’s public submission policy, refer to its website or the Federal Register document.